看词语>英语词典>subcontracted翻译和用法

subcontracted

英 [ˌsʌbkənˈtræktɪd]

美 [ˌsʌbˈkɑːntræktɪd]

v.  分包; 转包
subcontract的过去分词和过去式

过去式:subcontracted 

柯林斯词典

    The verb is pronounced /ˌsʌbkən'trækt/. The noun is pronounced /sʌb'kɒntrækt/. 动词读作 /ˌsʌbkən'trækt/,名词读作 /sʌb'kɒntrækt/。

  • VERB 将…分包;将…转包
    If one firmsubcontractspart of its worktoanother firm, it pays the other firm to do part of the work that it has been employed to do.
    1. The company is subcontracting production of most of the parts...
      该公司外包了大部分零部件的生产。
    2. They are cutting costs by subcontracting work out to other local firms.
      他们通过将任务转包给当地其他公司来减少成本。
  • 分包合同;转包契约
    Asubcontractis a contract between a firm which is being employed to do a job and another firm which agrees to do part of that job.

    双语例句

    • The toy was produced by Early Light Industrial, one of Mattel's contract manufacturing facilities in China, which subcontracted the painting of parts of the toy to another company.
      这些玩具汽车是由旭日实业有限公司(EarlyLightIndustrial)生产的。旭日实业是美泰在中国的合同制造企业之一,它又将玩具零部件的涂漆工作转包给了另一家企业。
    • The work to be subcontracted is defined and planned according to a documented procedure.
      根据文档化的过程定义,定义,计划子承包合同的工作。
    • Many cases in the public eye involve contracted or subcontracted detective agencies.
      许多被曝光的案子都牵扯进了签订合约或转包合同的侦探所。
    • Our company will sign a subcontract with the labor service subcontracted personnel legally, and fulfill our obligations according to the contract terms.
      我公司将同劳务分包人依法签订分包合同,并按照合同条款履行义务。
    • The project fund for the subcontracted works has been released as scheduled.
      已按计划发放用于分包工程的项目资金。
    • Most of the bricklaying has been subcontracted to a local builder.
      大部分砌砖工作转包给一名当地的建筑商。
    • This paper provides a quite scientific thought and method for the supplier quality assurance capability assessment in China's subcontracted program, which will be helpful to realize the goals of "High-quality, short time to market, and Low-cost" in commercial aircraft production.
      波音预测未来商务飞机和航空服务市场本文为我国转包生产项目供应商质量保证能力的评定提供了比较科学的思路与方法,为实现民机项目优质、准时、低成本的生产目标打下了基础。
    • The design task is subcontracted to or privately consigned to designers of other design organizations;
      将设计任务转包或私拉其他机构设计人员完成的设计方案;
    • The electrical work has been subcontracted to Smith Ltd..
      电工工作已转承包给史密斯有限公司。
    • They had subcontracted some of the work to an electrician.
      他们已将某些工程分包给一个电工。