看词语>英语词典>estimations翻译和用法

estimations

英 [ˌɛstɪˈmeɪʃənz]

美 [ˌɛstəˈmeɪʃənz]

n.  判断; 评价; 看法; (对水平、数量等的)估计
estimation的复数

柯林斯词典

  • N-SING 评价;看法;判断
    Yourestimationof a person or situation is the opinion or impression that you have formed about them.
    1. He has gone down considerably in my estimation.
      我对他的评价已经一落千丈。
    2. ...Lee Dixon, the best player on the pitch in his manager's estimation.
      教练心目中球场上最好的球员李·狄克逊
  • N-COUNT 估算;估价
    Anestimationis an approximate calculation of a quantity or value.
    1. In fact, the first group were absolutely correct in their estimation of this man's height.
      事实上,第一组人对这名男子身高的估计完全正确。
    2. ...estimations of pre-tax profits of £2.25 million.
      估计税前利润达225万英镑

双语例句

  • In this paper, estimations of varying-coefficient models with the correlated random errors are given by the local linear method. Furthermore, its asymptotical formalities are discussed.
    在误差相关的情况下,使用局部线性方法给出变系数模型的估计,并讨论估计的渐近正态性。
  • The Kalman Filtering and Optimal Smoothing Estimations for Gyro Drift
    陀螺漂移的卡尔曼滤波和最优平滑估计
  • This reduction in uncertainty also reduces the variance in estimations, since there is a direct correlation between these factors and the ability to produce sound estimates.
    这种不确定性的削减还减少了估计中的变化,因为在这些因素和生成可靠估值的能力之间存在直接的关联。
  • Statistical Comparisons on Parameter Estimations in Electromigration Tests
    电迁移测试中模型参数估计方法的比较
  • Some Notes on Convergence Rates for Error Variance Estimations in Linear Models
    关于线性模型中误差方差估计的收敛速度的若干注记
  • In particular, the team can estimate the three values lowest, nominal, and highest estimations assuming that the risk was removed, and then apply these values to reestimate the project variance.
    特别地,团队可以估计三个值最低、标准和最高估计值交涉去掉了风险,并且应用这些值重新估计项目方差。
  • The estimated results of the slopes are introduced into the EKF to get state estimations without radome interference which generates the guidance law command.
    将斜率估计结果代入EKF,得到滤除天线罩误差影响的系统状态量估计结果并形成制导指令。
  • Cost estimations for various schemes do not include preliminary items and the caisson units.
    每个方案的估价不包括开办费用和海堤沉箱的价钱。
  • One could then focus on the fundamentals as projected by the earnings estimations.
    然后可以将重点定位在盈利预测基本因素上。
  • High variances in the estimations of project parameters are therefore high risks to the project, and early reduction of these variances is important for the project.
    因而项目参数估计中的高方差对项目来说是高风险的,尽早减少这些方差对项目来说是重要的。