estimations
英 [ˌɛstɪˈmeɪʃənz]
美 [ˌɛstəˈmeɪʃənz]
n. 判断; 评价; 看法; (对水平、数量等的)估计
estimation的复数
柯林斯词典
- N-SING 评价;看法;判断
Yourestimationof a person or situation is the opinion or impression that you have formed about them.- He has gone down considerably in my estimation.
我对他的评价已经一落千丈。 - ...Lee Dixon, the best player on the pitch in his manager's estimation.
教练心目中球场上最好的球员李·狄克逊
- He has gone down considerably in my estimation.
- N-COUNT 估算;估价
Anestimationis an approximate calculation of a quantity or value.- In fact, the first group were absolutely correct in their estimation of this man's height.
事实上,第一组人对这名男子身高的估计完全正确。 - ...estimations of pre-tax profits of £2.25 million.
估计税前利润达225万英镑
- In fact, the first group were absolutely correct in their estimation of this man's height.
双语例句
- In this paper, estimations of varying-coefficient models with the correlated random errors are given by the local linear method. Furthermore, its asymptotical formalities are discussed.
在误差相关的情况下,使用局部线性方法给出变系数模型的估计,并讨论估计的渐近正态性。 - The Kalman Filtering and Optimal Smoothing Estimations for Gyro Drift
陀螺漂移的卡尔曼滤波和最优平滑估计 - This reduction in uncertainty also reduces the variance in estimations, since there is a direct correlation between these factors and the ability to produce sound estimates.
这种不确定性的削减还减少了估计中的变化,因为在这些因素和生成可靠估值的能力之间存在直接的关联。 - Statistical Comparisons on Parameter Estimations in Electromigration Tests
电迁移测试中模型参数估计方法的比较 - Some Notes on Convergence Rates for Error Variance Estimations in Linear Models
关于线性模型中误差方差估计的收敛速度的若干注记 - In particular, the team can estimate the three values lowest, nominal, and highest estimations assuming that the risk was removed, and then apply these values to reestimate the project variance.
特别地,团队可以估计三个值最低、标准和最高估计值交涉去掉了风险,并且应用这些值重新估计项目方差。 - The estimated results of the slopes are introduced into the EKF to get state estimations without radome interference which generates the guidance law command.
将斜率估计结果代入EKF,得到滤除天线罩误差影响的系统状态量估计结果并形成制导指令。 - Cost estimations for various schemes do not include preliminary items and the caisson units.
每个方案的估价不包括开办费用和海堤沉箱的价钱。 - One could then focus on the fundamentals as projected by the earnings estimations.
然后可以将重点定位在盈利预测基本因素上。 - High variances in the estimations of project parameters are therefore high risks to the project, and early reduction of these variances is important for the project.
因而项目参数估计中的高方差对项目来说是高风险的,尽早减少这些方差对项目来说是重要的。